TURBOCAM – Route 9

Barrington, NH Emanuel Engineering designed and oversaw the construction of Turbocam’s latest facility on Route 9 in Barrington, NH.  The project was designed in three phases.  Phase I and IA have been completed and constructed.  Phase 1 is a 41,000 square foot manufacturing facility and Phase 1A is an 11,000 square foot office building complete … Read more

Arc Source

Seabrook, NH This project consisted of providing the structural foundation design for this 180 foot by 180 foot pre-engineered steel building.  The project also consisted of providing the foundation design for a large scale tank farm.  The on-site soil conditions were a challenge and large spread footings were used to support the long span steel … Read more